SMO – Diriyah
City: Diriyah
Sector: Mixed-Use
Status: Completed
Overview: This project reflects Borooq Al Arabia’s capability to deliver systems within a sensitive development environment, with quality and documentation that support operational readiness.
Challenge: The project required high operational readiness along with precise control over execution and documentation.
Solution / Execution Execution was carried out through precise scope planning, disciplined phased implementation, operational inspections and testing, and thorough documentation of results—enhancing clarity of deliverables prior to handover.
Handover Deliverables / Execution Outcome:
- Works executed in accordance with the approved scope
- Support for inspection and testing
- Documented reports
- Checklists and closure of observations
- As-Built drawings (as required)
- Handover documentation and post-delivery support when needed
